Clearwater River Watershed District
  • Learn About the CRWD
    • CRWD History
    • Board of Managers
    • Board Meetings
    • Meeting Minutes
    • Advisory Committee
    • Staff
    • Guiding Documents >
      • CRWD 10 Year Watershed Plan
      • CRWD Rules & Regulations
      • Policy Book
    • CRWD Facts
    • Glossary
  • Reports
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Project Inspection Reports
  • How You Can Help
    • AIS Education >
      • 2023 AIS Forum
      • 2022 AIS Forum
    • Incentives >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Invasive Species
    • Implement Best Management Practices (BMPs)
    • Increase your knowledge
    • Join a Lake Association
  • Projects
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
      • Lake Augusta Aeration Project
      • Lake Augusta Erosion Control Project
      • 1980 Monitoring Program
      • Non-Point Source Pollution Abatement (TCCP) Project
      • Upper Lakes Aeration and Mechanical Fish Removal
      • Watkins Wetland Isolation Project
      • Watkins Wetland Treatment System
      • Replacement Projects for Aerators
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake South Notch Weir
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clear Lake North V-Notch Weir
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
    • Water Quality Monitoring Program
  • Contact

​Norton Avenue Basin

This basin, located above Lake Augusta near Norton Ave on 100th Street NW (Wright County), serves to slow the flow of water downhill to Lake Augusta. This basin was constructed to correct a developing erosion problem that was sending a large amount of sediment into Lake Augusta. By allowing runoff to pond in the basin during rain events rather than gouging the hillside, sediment is kept on the land instead of in the lake.
​
Preliminary Engineer's Feaibility Study - Norton Ave NW Erosion Control Project July 2007
Preliminary Engineer's Feaibility Study - Norton Ave NW Erosion Control Project July 2007 - Diagram

View Project Photos

Picture
Picture
Picture
This page is maintained by CRWD Board Managers. 
​
​© Copyright 2020
Board Meetings
Third Wednesday of the month at 6pm
​
Special and emergency meetings may be called. Such meetings will be properly notice per MN Statutes. 
Clearwater River Watershed District 
93 Oak Avenue South, Suite 5
Annandale, MN 55302

Mailing Address:
3235 Fernbrook Ln N
​Minneapolis, MN 55447
Website created by Skol Marketing
  • Learn About the CRWD
    • CRWD History
    • Board of Managers
    • Board Meetings
    • Meeting Minutes
    • Advisory Committee
    • Staff
    • Guiding Documents >
      • CRWD 10 Year Watershed Plan
      • CRWD Rules & Regulations
      • Policy Book
    • CRWD Facts
    • Glossary
  • Reports
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Project Inspection Reports
  • How You Can Help
    • AIS Education >
      • 2023 AIS Forum
      • 2022 AIS Forum
    • Incentives >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Invasive Species
    • Implement Best Management Practices (BMPs)
    • Increase your knowledge
    • Join a Lake Association
  • Projects
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
      • Lake Augusta Aeration Project
      • Lake Augusta Erosion Control Project
      • 1980 Monitoring Program
      • Non-Point Source Pollution Abatement (TCCP) Project
      • Upper Lakes Aeration and Mechanical Fish Removal
      • Watkins Wetland Isolation Project
      • Watkins Wetland Treatment System
      • Replacement Projects for Aerators
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake South Notch Weir
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clear Lake North V-Notch Weir
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
    • Water Quality Monitoring Program
  • Contact