Clearwater River Watershed District
  • Learn About the CRWD
    • CRWD History
    • Board of Managers
    • Board Meetings
    • Meeting Minutes
    • Advisory Committee
    • Staff
    • Guiding Documents >
      • CRWD 10 Year Watershed Plan
      • CRWD Rules & Regulations
      • Policy Book
    • CRWD Facts
    • Glossary
  • Reports
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Project Inspection Reports
  • How You Can Help
    • AIS Education >
      • 2023 AIS Forum
      • 2022 AIS Forum
    • Incentives >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Invasive Species
    • Implement Best Management Practices (BMPs)
    • Increase your knowledge
    • Join a Lake Association
  • Projects
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
      • Lake Augusta Aeration Project
      • Lake Augusta Erosion Control Project
      • 1980 Monitoring Program
      • Non-Point Source Pollution Abatement (TCCP) Project
      • Upper Lakes Aeration and Mechanical Fish Removal
      • Watkins Wetland Isolation Project
      • Watkins Wetland Treatment System
      • Replacement Projects for Aerators
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake South Notch Weir
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clear Lake North V-Notch Weir
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
    • Water Quality Monitoring Program
  • Contact

​Cedar Lake Aquatic Invasive Species (AIS) Project

The Clearwater River Watershed District was petitioned by the Cedar Lake Conservation Club to institute a aquatic invasive species (AIS) project for Cedar Lake. Aquatic invasive species are detriments to lakes, causing a loss of recreational value as well as damage to a lake's ecosystem. At this time, Cedar Lake is infested with two invasive species, Eurasian Watermilfoil and Curly-leaf Pondweed. The project provides a funding mechanism to combat present and future invasive species. (Note: Curly-leaf Pondweed treatment is funded via the Cedar, Albion, Swartout, Henshaw Project #06-1)

Cedar Lake AIS Engineer's Report
Cedar Lake AIS Appraiser's Report
Picture
Picture
Picture
This page is maintained by CRWD Board Managers. 
​
​© Copyright 2020
Board Meetings
Third Wednesday of the month at 6pm
​
Special and emergency meetings may be called. Such meetings will be properly notice per MN Statutes. 
Clearwater River Watershed District 
93 Oak Avenue South, Suite 5
Annandale, MN 55302

Mailing Address:
3235 Fernbrook Ln N
​Minneapolis, MN 55447
Website created by Skol Marketing
  • Learn About the CRWD
    • CRWD History
    • Board of Managers
    • Board Meetings
    • Meeting Minutes
    • Advisory Committee
    • Staff
    • Guiding Documents >
      • CRWD 10 Year Watershed Plan
      • CRWD Rules & Regulations
      • Policy Book
    • CRWD Facts
    • Glossary
  • Reports
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Project Inspection Reports
  • How You Can Help
    • AIS Education >
      • 2023 AIS Forum
      • 2022 AIS Forum
    • Incentives >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Invasive Species
    • Implement Best Management Practices (BMPs)
    • Increase your knowledge
    • Join a Lake Association
  • Projects
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
      • Lake Augusta Aeration Project
      • Lake Augusta Erosion Control Project
      • 1980 Monitoring Program
      • Non-Point Source Pollution Abatement (TCCP) Project
      • Upper Lakes Aeration and Mechanical Fish Removal
      • Watkins Wetland Isolation Project
      • Watkins Wetland Treatment System
      • Replacement Projects for Aerators
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake South Notch Weir
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clear Lake North V-Notch Weir
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
    • Water Quality Monitoring Program
  • Contact