Clearwater River Watershed District
  • About
    • CRWD History
    • Board of Managers
    • Board Meetings
    • Advisory Committee
    • Staff
    • General CRWD Info
    • Glossary
  • Projects
    • Carp Management 2023-2024
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
      • Lake Augusta Aeration Project
      • Lake Augusta Erosion Control Project
      • 1980 Monitoring Program
      • Non-Point Source Pollution Abatement (TCCP) Project
      • Upper Lakes Aeration and Mechanical Fish Removal
      • Watkins Wetland Isolation Project
      • Watkins Wetland Treatment System
      • Replacement Projects for Aerators
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake North V-Notch Weir
    • Clear Lake South Notch Weir
    • Clear Lake IESF
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
  • Programs
    • Water Quality Monitoring Program
    • Invasive Species
    • AIS Education >
      • 2023 AIS Forum
      • 2022 AIS Forum
    • Grants & Cost Share Programs
  • Resources
    • CRWD 10 Year Watershed Plan
    • Board Meeting Minutes
    • CRWD Rules & Regulations
    • Policy Book
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Project Reports
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Project Inspection Reports
  • Lake Report Cards
  • How You Can Help
    • Landowner Resources >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Increase your knowledge
    • Join a Lake Association
  • Contact

CRWD Bog Control Projects

Bog Control Projects

Clearwater / Grass Lakes Bog Control Project and Lake Augusta Bog Control Project
In response to high water levels in the mid-1980s that caused severe floating bog problems in these lakes (which lead to several emergency bog removal activities), these two bog control projects were set up with the cooperation of the lake property owners involved. These projects included acquisition and improvement of access areas for bog removal, and the funding (via assessment) and process for removal of floating bogs deemed harmful. Estimated cost for the two projects was $17,000, and they were initiated in the summer of 1985.

Other Bog Control Measures
In 2011, the Clearwater River Watershed District experienced high water that rivaled the water levels in the mid-1980s. The CRWD works in conjunction with the Minnesota Department of Natural Resources as well as other local authorities in removal of problematic bogs to protect the three lakes from flooding caused by bogs blocking the flow of the Clearwater River.

The CRWD reminds all citizens that the CRWD will not remove bogs from private property. The District will only become involved with removing bogs when they threaten to block the flow of the Clearwater River. To move bogs from your property, whether they drift onto your property or not, will require a permit from the Minnesota Department of Natural Resources. Failure to do so runs the risk of penalties. Contact your lake association to see what they are doing about nuisance bogs.

Click here to read the CRWD's Bog Control Policy.

View Project Photos

large floating bog in lake clogging underneath road bridge
Bog blocking bridge between Clearwater and Grass Lakes
Picture
Picture
Picture
This page is maintained by CRWD Board Managers. 
​
​© Copyright 2020
Board Meetings
Third Wednesday of the month at 6pm
​
Special and emergency meetings may be called. Such meetings will be properly notice per MN Statutes. 
Clearwater River Watershed District 
93 Oak Avenue South, Suite 5
Annandale, MN 55302

Mailing Address:
3235 Fernbrook Ln N
​Minneapolis, MN 55447
Website created by Skol Marketing
  • About
    • CRWD History
    • Board of Managers
    • Board Meetings
    • Advisory Committee
    • Staff
    • General CRWD Info
    • Glossary
  • Projects
    • Carp Management 2023-2024
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
      • Lake Augusta Aeration Project
      • Lake Augusta Erosion Control Project
      • 1980 Monitoring Program
      • Non-Point Source Pollution Abatement (TCCP) Project
      • Upper Lakes Aeration and Mechanical Fish Removal
      • Watkins Wetland Isolation Project
      • Watkins Wetland Treatment System
      • Replacement Projects for Aerators
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake North V-Notch Weir
    • Clear Lake South Notch Weir
    • Clear Lake IESF
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
  • Programs
    • Water Quality Monitoring Program
    • Invasive Species
    • AIS Education >
      • 2023 AIS Forum
      • 2022 AIS Forum
    • Grants & Cost Share Programs
  • Resources
    • CRWD 10 Year Watershed Plan
    • Board Meeting Minutes
    • CRWD Rules & Regulations
    • Policy Book
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Project Reports
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Project Inspection Reports
  • Lake Report Cards
  • How You Can Help
    • Landowner Resources >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Increase your knowledge
    • Join a Lake Association
  • Contact