Clearwater River Watershed District
  • Home
  • Learn About the CRWD
    • Board of Managers
    • Board Meetings
    • Meeting Minutes
    • Advisory Committee
    • Staff
    • Guiding Documents >
      • CRWD 10 Year Watershed Plan
      • CRWD Rules & Regulations
      • Policy Book
    • General Watershed Information
    • AIS Education
    • Glossary
  • Reports
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Reports
  • How You Can Help
    • Incentives >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Invasive Species
    • Implement Best Management Practices (BMPs)
    • Increase your knowledge
    • Join a Lake Association
  • Projects
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake South Notch Weir
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clear Lake North V-Notch Weir
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
    • Water Quality Monitoring Program
  • Contact

​Clearwater River Channel Stabilization (CCM Riparian) Project

This project began in 2010 and is located in the upper reaches of the Clearwater River near Meeker County Highway 17. The purpose of the project was to provide vegetated slopes and ground cover, as well as stream bank toe and head cutting protection, to targeted sections (private land)of the Clearwater River where the streambanks are eroding. To combat this erosion problem, three different stages of the project are preformed along the target sections.

  1. Trees along the streambank are thinned to allow sunlight to reach the ground. The felled trees and the corresponding brush were reused as slope breaks, toe protection, and grade controls. The brush was formed into bundles and staked in place to act as toe protection along the waters edge.
  2. Willows on-site are harvested and planted into the streambank to create root systems that will anchor the streambank and help prevent erosion.
  3. Deadfalls in the stream are cleared. Logs from these deadfalls are used for slope breaks, toe protection, and grade control.
  4. The project is re-evaluated after a set time to see if more thinning and placing of breaks and bundles, as well as more plantings, are needed.

This project was a grant-funded project with the Conservation Corps of Minnesota (CCM). The District provided materials and guidance, the CCM provides work crews, and landowners agree to allow work to be completed on their property. The project was completed in 2013, and protected ~7,500 lineal feet of river from further erosion.

Contact the District if you are interested on have this type of work done on your property.
Picture
Picture
Picture
This page is maintained by CRWD Board Managers. 
​
​© Copyright 2020
Board Meetings
Third Wednesday of the month at 6pm
​
Special and emergency meetings may be called. Such meetings will be properly notice per MN Statutes. 
Clearwater River Watershed District 
93 Oak Avenue South, Suite 5
Annandale, MN 55302

Mailing Address:
3235 Fernbrook Ln N
​Minneapolis, MN 55447
Website created by Skol Marketing
  • Home
  • Learn About the CRWD
    • Board of Managers
    • Board Meetings
    • Meeting Minutes
    • Advisory Committee
    • Staff
    • Guiding Documents >
      • CRWD 10 Year Watershed Plan
      • CRWD Rules & Regulations
      • Policy Book
    • General Watershed Information
    • AIS Education
    • Glossary
  • Reports
    • Annual Reports
    • Audit Reports
    • CRWD Brochures
    • Total Maximum Daily Load Reports
    • Water Quality Monitoring Reports >
      • Grass Lake Dam Readings
    • Reports
  • How You Can Help
    • Incentives >
      • Agricultural Incentives
      • Residential / Commercial Incentives
      • Partnership Incentives
    • Invasive Species
    • Implement Best Management Practices (BMPs)
    • Increase your knowledge
    • Join a Lake Association
  • Projects
    • Clearwater River Chain of Lakes (1980) Restoration Project >
      • Annandale Wetland Treatment System
      • Kingston Wetland Feasibility Study and Restoration Project
    • Total Maximum Daily Load (TMDL) Implementation Projects >
      • Alternative Tile Intake Project
      • Clearwater River Channel Stabilization (CCM Riparian) Project
      • Clearwater River Restoration & Protection Phase II Project
      • City of Kimball Stormwater Treatment Phase II
      • Targeted Fertilizer Application Reduction Project
      • Watkins Area Stormwater Treatment Project
      • Willow Creek (Kimball Phase I) Stormwater Retention / Reuse Project
      • Potential Future Implementation Projects
    • Bass Lake AIS Management
    • Clear Lake South Notch Weir
    • Cedar Albion Swartout Henshaw Project #06-1 >
      • CASH Project #06-1 Fish Barriers
      • CASH Project #06-1 Rough Fish Removal
      • CASH Project #06-1 Segner Pond
      • Cedar Lake Watershed Protection & Improvement Project
    • Clear Lake North V-Notch Weir
    • Clearwater Lake Milfoil Treatment
    • CRWD Bog Control Projects
    • Communal Sanitary Sewer Systems >
      • Clearwater Harbor - Hidden River Project #18-1 (Nitrogen Mitigation & Analysis Plan Implementation)
    • Lake Augusta Aquatic Invasive Species (AIS) Project
    • Lakes Louisa & Marie Aquatic Invasive Species (AIS) Project
    • Norton Avenue Basin
    • Ostmark Basin
    • Pleasant Lake Outlet Control Structure
    • Cedar Lake Aquatic Invasive Species (AIS) Project
    • School Section Lake Outlet Control Structure
    • Wastewater Treatment Task Force
    • Water Quality Monitoring Program
  • Contact